Tools to manage the CMS TEC Petal Production
Tools about Petals
Petal status after TEC sectors integration 
- list of available Petal mechanics with pre-mounted AOH
This page list the petals ready for module integration in the different centers. Petals in transfer are also listed.
- list of fully assembled petals after module integration
This page list the petals in the different centers which are fully assembled from the module integration point of view. The back petals
from this list are not completed from the DB point of view until DOHM and DOHs integration which will occur at TICs. Petals in transfer are also listed.
- Check lists: should be sent together with petals to the TICs
-
Module_reception_checklist: this one is meant for module business
inside the PICs: from reception until preparation for petal integration, including all the steps as they should be done
-
Petal_checklist: this one is meant for petal integration: from reception
of the pre-mounted mechanics until packaging of the petals LT tested for shipment to the TICs
Petal production plot
Petals transportation rules
Petal versionning from Katja's mail
Tools about modules
-
Modules ready for Petal Integration
- list of available modules (booked modules highlighted in blue boxes)
This page list the modules available for petal integration in the different centers. Modules in transfer are also indicated.
- selection of modules for petal integration
: tool to pair and book modules by set,
tutorial
Allows to pair modules according to the depletion voltage (petal ID is needed). The selection can be booked for this petal (booking by set). Booking feature is
password protected (ask Jean-Charles or Jean-Laurent)
- More tools about booking: list of booked modules, manual
booking, unbooking, change of petal ID, tutorial
This page list the booked modules according to the petal ID and the PIC.
Special actions are also possible (password needed). These actions are :
- manual booking/unbooking of modules
- change of the petal ID for a full set of booked modules
- Module inventory in each center producing TEC modules
This page gives for each center involved in TEC module production or integration, the status of each module with the flags from Gantry, Bonding and ARC test.
Documentation
Usefull links
  Jean-Laurent Agram
  Jean-Charles Fontaine